DC 5V Micro 15mm Stepper Stepping Motor 90mm Long Lead Linear Screw Nut Slider 2-phase 4-wire 15.5 Ohms DIY 3D printer

★★★★★ 4.1 100 reviews

US$18.12
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by preprod.memeradio.org
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$18.12
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 30
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by preprod.memeradio.org
Free 30-day returns Details

Product details

Management number 211203871 Release Date 2026/04/04 List Price US$18.12 Model Number 211203871
Category

Specifications:Driving voltage: DC4-9V/100-500mA 2-phase 4-wireMotor diameter: 15mmLength of screw rod: 90mmSlide stroke: 80mmScrew thread pitch: 0.5mmScrew diameter: 3mmMotor diameter: 15mmPhase Resistance: 15.5 OhmsBlue A+ black A- red B+ yellow B-Package includes:Mini Long Screw Stepper Motor x 1pcItem specifics:Phase: 2Type: Permanent MagnetCertification: NONEOrigin: Mainland ChinaCondition: NewModel: Mini 15mm Stepper MotorResistance per phase: 15.5 ohmsWiring configuration: 4-Wire BipolarCountry/region of manufacture: ChinaCurrent type: DCFull step angle: 18Shaft diameter: 3mmNominal rated input voltage: 5V

  • Package Includes: Mini Long Screw Stepper Motor x 1pc
  • Phase: 2
  • Type: Permanent Magnet
  • Certification: NONE
  • Origin: Mainland China
Brand Name Generic
Unit Count 1.0 Count
Manufacturer DAVITU

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.1 out of 5
★★★★★
100 ratings | 41 reviews
How item rating is calculated
View all reviews
5 stars
77% (77)
4 stars
7% (7)
3 stars
4% (4)
2 stars
2% (2)
1 star
10% (10)
Sort by

There are currently no written reviews for this product.